Life Sciences & Controlled Environments

20 Water Street, Canary Wharf, London

Location London
Client Aviadobio and Canary Wharf Group
Main Contractor Bulb Laboratories
Size 38,000 sq ft
Duration 19 weeks
Completion August 2023

Project overview

Conquest Electrical undertook the electrical design and electrical fit out of circa 11,000 sq ft, across Level 6, for the conversion of shell and core office space into a R&D facility which includes CL2 laboratories and CATB Luxury office space.  Full electrical installation design and works comprised of CATB fit out, including associated mains switchgear, UPS systems, Underfloor power systems, general and specialist internal lighting and lighting control systems, Small Power, testing and commissioning.

Key deliverables

  • LV Distribution
  • Containment system
  • Small power
  • UPS Systems
  • Lighting & lighting control
  • Mechanical power
  • Data & Telecoms
  • Fire Detection & Alarm
  • Testing & Commissioning