40 Bank Street, Canary Wharf, London
Project overview
Conquest Electrical performed the intrinsic electrical design and electrical fit-out for hVIVO’s new facility in Canary Wharf, a project which forms part of the Canary Wharf Group’s aim of making Canary Wharf a new hub for life sciences. Electrical works were carried out across circa 39,049 sq ft, across Level 24 and Level 25, converting shell and core office space into fully serviced and cutting-edge CL3 laboratory spaces, office and supporting laboratory hub spaces, as well as 52 individual accommodation rooms for patients, each comprising of a bedroom and adjoining bathroom.
Scope of Works
The scope of works included Low Voltage Distribution, submains, ELV containment, metering, installation of split load distribution boards, small power, data, Fire Alarm, infrastructure containment and power supplies for nurse call systems and stations, general and specialist lighting and lighting controls, mechanical power supplies including infrastructure wiring and controls for leak detection systems, AV infrastructure, testing and commissioning. Electrical works in respect of the CL3 laboratory also included installation of UPS and back-up power supplies. Key deliverables included LV Distribution, Containment System, Small Power, UPS Systems, Lighting & Lighting Control, Mechanical Power, Data & Telecoms, Fire Detection & Alarm, and Testing & Commissioning.
Results
The completed works comprised the electrical design and fit-out of hVIVO’s new facility, including CL3 laboratory spaces, office and supporting laboratory hub spaces, patient accommodation rooms, LV distribution, containment systems, power systems, lighting and controls, data and telecoms, fire detection and alarm, UPS systems, and testing and commissioning.
Key deliverables
- LV Distribution
- Containment system
- Small power
- UPS Systems
- Lighting & lighting control
- Mechanical power
- Data & Telecoms
- Fire Detection & Alarm
- Testing & Commissioning